FANDOM



Arena do Sport is a multi-use stadium in Recife, Brazil. It was estimated the inauguration on May 13, 2015.

It is used mostly for football matches and as the home stadium of Sport Recife, replacing the Estádio Ilha do Retiro. With 46,000 over capacity. And reaching up to 55,000 with the removal of removable seats behind the goals. The stadium will be one of the most modern in South America.

Concept

The sports complex will occupy a total area of 174 thousand square meters will feature the Multipurpose Arena, known as (Arena do Sport), and with capacity above 46,000 seats, and even the Arena can increase capacity to 55,000 with the removal of removable seats behind the goals. Of which 15,000 special chairs, chairs captives 5800, 2900 and 1440 suites cabins and 19.8 numbered chairs. Arena will cost between 350 and 400 million reais. The parking lot will have 4.450 vacancies. In the complex will have a shopping, hotel, two office building, a convention center and especially maintaining and redesigned seat and saputizeiro. And wanting to keep all the equipment you have today, all amateur sports as well as swimming pools, will be covered by the project. Contemplating all amateur and Olympic sports that the club now has a total of 14 sports. All they will have better structures and blocks. The pool area, much used by its members is maintained with no loss of space. With a gym with capacity for 2,000 spectators, the complex also has an amphitheater with capacity for 15 000 people, where events will be held. Has a modern museum, likened to the museums of the best clubs in the world, with all the history of the club and with their trophies. The contract with the construction company only allow the use of surface for 30 years. All recipes now preserved, i.e., the box office of the games, the collection of members, the TV rights. The sale of 100% of uniform Sport continues. The more revenue: a percentage of everything that is leased to third parties, this 30-year period. That is, the income of the business shopping and shows the possible sale of the name of the Arena of the Sport. Moreover, it will have a significant financial contribution that will be used to fix old debts of the club. After 30 years, all proceeds will be 100% of Sport.

History

In December 2012, the club in Recife, to launch the project, and the signature is therefore entered in the contract work in the city. And in May 2013, will begin the demolition process of Ilha do Retiro, with estimates of the current president of the club, the only way to start the process works, with a term of two years, ending in mid-May 2015, Sports when making your 110th anniversary.

Beginning of Construction

In May 2013, will begin the demolition process of Ilha do Retiro, with estimates of the current president of the club, the only way to start the process works, with a term of two years, ending in mid-May 2015

References

External links



This article uses material from the Wikipedia article Arena do Sport, that was deleted or is being discussed for deletion, which is released under the Creative Commons Attribution-ShareAlike 3.0 Unported License.
Author(s): Darwinek Search for "Arena do Sport" on Google
View Wikipedia's deletion log of "Arena do Sport"
Wikipedia-logo-v2
This article uses material from the Wikipedia article Arena do Sport, that was deleted or is being discussed for deletion, which is released under the Creative Commons Attribution-ShareAlike 3.0 Unported License.
Author(s): Cloudz679 Search for "Arena do Sport" on Google
View Wikipedia's deletion log of "Arena do Sport"
Wikipedia-logo-v2

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.